FIBER FOR BUSINESS

Fast Fiber, Clean Cabling

We plan and install fiber internet, optical cable runs, and structured cabling for offices and campuses. Get steady speeds, tidy racks, and a network that is ready for daily work.

Fiber entrance room with bundled cable, splice enclosure, and cyan-lit rack glow after a storm.

Metric 01

250+

business sites wired

Metric 02

48 hrs

average site survey

Metric 03

99.9%

uptime target we build for

HOW IT WORKS

Four Steps To Go Live

We bring the circuit online, set the handoff, and test the first live link.

Fiber handoff cabinet and wall termination in a warm office nook with a glowing cyan link

Single site

Fiber Internet Setup

From $1,200

We bring the circuit online, set the handoff, and test the first live link.

Floor-level view of a fiber cable run turning into a ceiling tray in a riser closet.

Up to 2 floors

Optical Cable Install

From $2,400

Extreme macro of fiber network design parts on pale travertine with a deep blue accent.

Plan first

Network Design

From $1,800

Neat structured cabling in a finished office ceiling void with warm daylight and white access points.
01Office or campus

Structured Cabling

From $3,200

Clean Cat6 and fiber backbone runs for desks, APs, cameras, and servers.

Fiber upgrade cabinet with coiled loops and a cool cyan glow in a modern equipment room
02Carrier ready

Bandwidth Upgrades

From $950

We prep the network, check the handoff, and line up the speed change.

Fiber service kit on a stone shelf with leads, dust caps, and a compact appliance.
03Monthly service

Managed Connectivity

From $499/mo

Ongoing link checks, fault tracking, and monthly network notes.

CORE SERVICES

Fiber Services For Busy Sites

We inspect the space, map cable paths, and list every point that needs service.

Overhead site-check flatlay of wall box, conduit elbow, cable grommet and ceiling tile on plaster.
01

Site Check

We inspect the space, map cable paths, and list every point that needs service.

Stone shelf still life with patch panel, rack ear, cable comb and sealed black cable spool.
02

Build Plan

You get a clear design, gear list, and work order before the install date.

Fusion splicer, cleaved fiber, heat-shrink sleeves and dust caps on a concrete tray.
03

Install and Test

Our crew runs fiber, labels lines, and tests each link before handoff.

Key, SFP module, maintenance case and patch leads on pale oak in soft side light
04

Support Handoff

We review the result, share notes, and stay on call after the job closes.

CLIENT RESULTS

Projects Built For Real Work

Site survey and walk-through Fiber handoff setup One office cable run Label and test each line Simple network map

Billed after surveyBilled after survey

Starter

From $1,200

  • Site survey and walk-through
  • Fiber handoff setup
  • One office cable run
  • Label and test each line
  • Simple network map
Most popularBilled per site

Signature

From $3,000

  • Everything in Starter
  • Optical cable install
  • Structured cabling plan
  • Bandwidth upgrade setup
  • Rack cleanup and labeling
  • Thirty-day check-in
Scoped by campusScoped by campus

Scale

Custom

  • Multi-building network design
  • Fiber backbone for campuses
  • MDF and IDF room planning
  • Managed connectivity rollout
  • Failover link setup
  • Quarterly service reviews

WHAT CLIENTS SAY

What Clients Say

Twelve desks and two meeting rooms got a stable fiber handoff before opening day.

Empty law office suite with tidy fiber cabling, wall rack, and polished wood trim.

Legal

Law office went live fast

Twelve desks and two meeting rooms got a stable fiber handoff before opening day.

Clean warehouse aisle with overhead fiber cabling, scanner docks, and a neat wall run.

Logistics

Warehouse cabling cleaned up

Campus fiber backbone with three buildings, conduit, lit vault and empty paths

Education

Campus link cut slowdowns

Clinic corridor with docked phones, imaging gear behind glass, and neat trunking

Healthcare

Clinic traffic stayed steady

Organized fiber rack in a warm data room, ready for more network capacity.

IT

Data team made room to grow

Macro of fiber project tools on a dark stone bench: tablet case, brass rack key, pouch and flashlight.

Office fiber plans

Maya Thornton

Fusion splicer kit, cleaver, splice tray and heat-shrink sleeves on brushed metal

Fiber and cabling

Evan Cho

Top-down fiber network parts on pale concrete with silver details

Rack maps and paths

Nina Patel

Open fiber service kit with tester case, SFP modules, dust caps and coiled patch leads

Live link checks

Carlos Reyes

Proof

Customer notes

Verified

Logical Fiber mapped our office cabling fast and left the rack neat.

Macro of fiber project tools on a dark stone bench: tablet case, brass rack key, pouch and flashlight.

Tanya Brooks

Office Manager, Northline Legal

Verified

Two floors came online the same week. The handoff was clean and the team stayed on schedule.

Fusion splicer kit, cleaver, splice tray and heat-shrink sleeves on brushed metal

Derrick Mills

Facilities Lead, Crestview Clinic

Verified

Our campus fiber upgrade cut slowdowns during peak hours and made support easier.

Top-down fiber network parts on pale concrete with silver details

Leah Nguyen

IT Director, Ridgepoint School

Service area

North Texas

Dallas, Fort Worth, Plano, Arlington, Irving

Dallas skyline over a hazy North Texas river plain at golden hour

Area 01

North Texas

Dallas, Fort Worth, Plano, Arlington, Irving

Hazy late-afternoon Central Texas hills with tiny Austin skyline over live oaks.

Area 02

Central Texas

Austin, Round Rock, Cedar Park, Pflugerville

Houston skyline above misty bayou wetlands at golden hour, calm open water below

Area 03

Greater Houston

Houston, Katy, Sugar Land, The Woodlands

Stone mission at South Texas sunrise above a quiet plain and cypress haze

Area 04

South Texas

San Antonio, New Braunfels, Schertz, Live Oak

The Map

Questions

Common Questions

Quick answers before visitors choose a product, service, or next step.

01How fast can you start a fiber install?+

Most small office jobs start with a site check in 2 to 5 business days, then we book the build date.

02Do you handle both fiber and Cat6 cabling?+

Yes. We run fiber backbone lines, Cat6 drops, labels, testing, and rack cleanup in one project.

03Can you upgrade our bandwidth too?+

Yes. We check the handoff, work with your carrier, and tune the network for the new speed.

04Do you work in occupied offices?+

Yes. We plan the route, keep work tidy, and schedule cuts after hours when needed.

05Which places do you serve?+

We serve North Texas, Central Texas, Greater Houston, and nearby business sites across each area.

06Do you offer managed connectivity?+

Yes. We monitor links, track faults, and send monthly notes so your team knows what changed.

Get Project Updates

Get clear notes on fiber installs, cabling tips, and network upgrades for offices and campuses.